Port de Mer Condominiums
Shower glass, vanity mirrors, and medicine cabinets — single-source supply saved $91,000 in vendor coordination and reduced from 3 suppliers to 1.
Port de Mer is a condominium development in Longueuil requiring shower glass, vanity mirrors, and medicine cabinets across three towers built in phases. The developer was coordinating 3 separate vendors, managing 3 different delivery schedules, and absorbing a 1.7% glass breakage rate that cost $19,000 on a previous tower. We consolidated everything under one contract, one schedule, one point of contact — and achieved a breakage rate of just 0.8% across 1,100+ individual glass pieces.
Financial Impact
Total project savings — vendor consolidation ($34K) + volume pricing ($38K) + breakage reduction guarantee ($19K)
Coordination savings — eliminated project management overhead of 3 separate vendors (glass, mirrors, cabinets)
Breakage cost savings — our packaging brought breakage rate down to 0.8% vs. the 1.7% industry-average across 1,100+ pieces
The Challenge
Three towers being built simultaneously with staggered completion dates — delivery had to match construction floor-by-floor
Previous project lost $19,000 to glass breakage in transit (1.7% industry rate across 1,100 pieces) — target was under 1%
Developer was managing 3 vendors (shower glass, vanity mirrors, cabinets) with 3 different timelines and contacts
Tight storage on-site — no space to warehouse more than 2 floors of material at any time
Condo association required consistent quality across all units — zero visible variation in glass, mirrors, or hardware
Our Solution
Single contract covering shower glass + vanity mirrors + medicine cabinets — one timeline, one invoice, one project manager
Custom crating with corner guards, surface film, and foam separators — engineered to minimize breakage
Just-in-time delivery: 2 floors of material per delivery, aligned exactly with framing completion dates
QC batch sampling: every 50th unit inspected for dimensional accuracy, surface quality, and hardware consistency
Staged manufacturing by tower: Tower A (Weeks 1-5), Tower B (Weeks 4-9), Tower C (Weeks 8-14) — overlapping production
Our Work
From Montréal to the world.

Frameless shower enclosure — consistent quality across all units

Vanity mirror and medicine cabinet — single-source supply
What Our Partners Say
On our last tower, we lost $19,000 to broken glass and spent 120 hours coordinating 3 vendors. With this approach, we had one phone number, breakage under 1%, and saved $91,000 total. We've already signed for Phase 2.
Director of Construction
Port de Mer Development Group
Port de Mer Condominiums
Longueuil, QC
“On our last tower, we lost $19,000 to broken glass and spent 120 hours coordinating 3 vendors. With this approach, we had one phone number, breakage under 1%, and saved $91,000 total. We've already signed for Phase 2.”
Director of Construction
Port de Mer Development Group
READY TO GET STARTED?
Ready to See Similar Results?
Get your project quote with verified timelines and pricing.
No commitment. No obligation. Just fast, accurate pricing.